HOUSE INFORMATION AS OF December 11, 2010

LOT 88  - 7 Regency Ridge

 Do not rely on any information without confirming with the office!   (978) 475-4011.

PROJECTED/ACTUAL PASSING: 05/24/02

REALTOR: Remax Elke Kappeler 470-3737 x123

Lot 88 is on Town Map 100, as Town lot 1K, 1-11.  Zoned SRC. The lot area is 73102 square feet with a frontage of 100 feet.  

===> Dig Safe # 20021900787.  DIG DATE 05/09/02 <===

Originally proposed foundation elevation:145.  Actual foundation elevation: 145.87.

PERMITS
PERMITNUMBERAPPLIEDGRANTEDFINAL INSP
Conservation96-49, 090-0777, 090-0776Y05/23/03
SSUP (Sewer)HC010147N/A05/08/01N/A
SSIP (Sewer)HC020142N/A04/12/02N/A
FIRER0104/17/0104/17/0105/09/02
FOUNDATIONB0103245/14/0105/14/0106/11/01
BUILDINGB01032406/19/016/19/0105/23/02

PLANS
PLAN MOST CURRENT DATE
SEWER/GRADE 05/09/01
FIRST FLOOR 07/21/01
SECOND FLOOR 07/21/01
KITCHEN 07/31/01

UTILITIES
TYPE METER NUMBER ACCOUNT #
ELECTRIC 21711907 D#  Temp:100527, Perm(400A):100528
GAS H90226 7405230060
DOMESTIC WATER 75549242 N/A
SPRINKLER WATER none N/A

ROOF SHINGLES

GUTTERS

SIDING

TRIM

Certainteed Brownstone (8/15) Grand Manor "Shangles"(Info) Asphalt laminated shingles Wicker color gutters installed over Front Door, Driveway, and Patio areas. Additional gutters with round copper downspouts (CO #44). Brick veneer as per plan on all sides including bays and dormers. There is an allowance of 60 cents per brick for a cored modular brick per buyers choice. House to be wrapped with Tyvek or Typar house wrap. with (Brick Veneer) Cortez (8/15) C.O.#30 (Brick color). Limestone sills staggered quoins, 5-high, skip 2, soldier course over arches and windows, no keystones. finger jointed pine trim as per plan. with Knots sealed, primed, and one coat finish paint _________[2]

WINDOWS

FRONT DOOR

OTHER DOORS

GARAGE DOORS

Pella Architect series casement style windows as per plan (muntins to be traditional pattern) in Bleeker Beige (custom) (CO #4)..

Shutters:There are no blinds.

___________________ [2]. There is an allowance of $10,000 for front door unit approx 6-0" x 6'-8" Lock to be Baldwin Images "Madison" in Distressed Antique Nickel. Baldwin "Classic" knobs and "Wave" lever door latches on doors (CO #21). KLM door at Mudroom exterior. Steel insulated six panel door between Garage and Mudroom. Steel insulated doors between Garage and Basement, and Garage Exterior (3) are Wood, raised panel pine Painted to match trim. 1/2 HP, Belt drive operator with keypad entry..

CHIMNEYS

FRONT WALL

REAR WALL

DECK  INFORMATION

Brick (Same as main house) as per plan for Living Room chimneys. Ex. large chimney pots as per C.O.#27 to be installed. No retaining walls at house. There will be two decorative "wing" walls flanking the beginning of driveway approx 8' x 20" by 2-4'. Material to be brick veneer (same as house) with brick veneer or limestone top (buyer's preference) No wall needed in rear of home. DECKING : Terrace (size and shape as per plan) off Great Room and kitchen and landing (4'x8' if any) off Game Room is Yankee Cobble pavers in Harvest Blend color, Muster K pattern with Quarry Blend border. Terrace to have integrated steps (two risers) around perimiter of upper portion (behind Great Room) risers to be brick veneer (to match house), capped with a single 12" band of limestone. Steps (as per plan) leading to lower portion (behind Kitchen), which will not be elevated above the surrounding grade.

RAILING:

STAIRS:  

NOTES:

FRONT STEPS

FRONT WALK

REAR STEPS

REAR WALK

DRIVEWAY

Limestone treads, brick risers. Boston Colonial Pavers Limestone treads, brick risers. Side entrance - Limestone treads, brick risers No rear walk Driveway to be Yankee Cobble pavers in Harvest Blend color, Muster K pattern with Quarry Blend border [4] as per plan [5] (based on 8382 square feet)

STAIRS
MAIN Cherry treads, pine risers. There will be an allowance of $10,000 for all handrails, posts, spindles, toe rails and other associated and decorative stairparts which will cover both parts chosen and installation and layout.
BACK Off Kitchen: Cherry treads, pine risers, Railings covered by allowance above.

Off Mudroom/Playroom: Cherry treads, pine risers, Railings covered by allowance above.

ATTIC Plywood treads and risers.
GARAGE Plywood treads and risers. Carpet by Berven of California, "Empowered" 26 - Color "Adobe Earth"
BASEMENT Plywood treads and risers. Carpet by Berven of California, "Empowered" 26 - Color "Adobe Earth" from Bradford Carpet in Saugus.

.

APPLIANCES
COMPACTOR Viking VUC181 Stainless
COOKTOP Thermador PCS366US ALSO: Thermador WD30XS warming drawer. Best PK2238 Hood.
DISHWASHER Miele G891 Premiere (stainless control panel, with kit to accept wood panels) Also: (2) Fisher Paykel DS602SS to accept wood panel. - One in kitchen and one in bar.
DISPOSAL none____________[2,4]
MICROWAVE Kitchenaid KCMS145SS w/ SS trim-kit
OVEN Thermador CM302US
REFRIGERATOR SubZero 642 Framed to accept wood panels And: GE TCX22PACAA (almond) Also: SubZero 427R overlay winechest and #235 Icemaker to accept wood panels

LOCATION CEILINGS TRIM: WALL/TRIMPAINT: FLOOR: CABINETS: COUNTERS: SINKS/FAUCET: TOILETS: TUBS: SHOWER: PLUMBING: MIRRORS: WALLTILE:
88 Back Bath: Off Mudroom

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile Tony's Durango (4/1) ____________. Starmark Windsor, Cherry/Earthen Giallo Veneziano (2/4) Kohler Caxton (K-2210) undermount sink in Biscuit Grohe 20.700.820 faucet in PC. Kohler Wellworth (K-3422-F) elongated toilet in Biscuit None. _____________________
88 Bath #2: Off Bedroom #2

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet 919 (3/22). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile ___________ _____________ ____________. Starmark Windsor, Cherry/Earthen. [4] Giallo Veneziano (2/4) 1-1/4" w/ogee type edge Kohler Caxton (K-2210) undermount sink in Biscuit Grohe 20.700.820 faucet in PC. Kohler Wellworth (K-3422-F) elongated toilet in Biscuit Kohler Memoirs (K-721) in Biscuit Grohe 28.179.000 handshower in PC. _____________________
88 Bath #3: off Bedroom #3

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell 1058 (2/28). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile _________________ ________________ _________________. Starmark Windsor, Cherry/Earthen. [4] Giallo Veneziano (2/4) 1-1/4" w/ogee type edge Kohler Caxton (K-2210) undermount sink in Biscuit Grohe 20.700.820 faucet in PC. Kohler Wellworth (K-3422-F) in elongated toilet in Biscuit Kohler Memoirs (K-722) in Biscuit. Grohe 28.179.000 handshower in PC. _____________________
88 Bedroom #2: Over Library

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet 919 (3/22). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Bedroom #3: Over Living Room

See it

9+' high, Vaulted with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell 1058 (2/28). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Bridge: 2nd Floor Hallway

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Butler's Pantry: Kit to DR

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble _________________ ________________ ________________. Custom by Scandia__________________. [1] 1-1/4" Granite w/large ogee edges. Giallo Veneziano (2/4).
88 Dining Room:

See it

9' high, Tray with Skip Troweled. texture. 3-1/2" Cherry Arch to Foyer . Walls are Martin Senour 60-2 (3/27). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Foyer:

See it

18' high, Flat with Skip Troweled texture. 3-1/2" Cherry Door and casing. All other trim clear pine. . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble Tony's Durango 16" Grout: [5]____________.
88 Game Room: Off Living Room

See it

13+' high, Vaulted with Skip Troweled texture. 3-1/2" Jalco . Walls are Martin Senour 60-2 (2/28). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat. Scandia - _________________________. 1-1/4" Granite w/large ogee edges. Gold Uba Tuba (4/11) 1 Switch in counter controlling an outlet in sink base cabinet. Cabo sink
88 Great Room: Rear and center

See it

18' high, Flat/Sloped with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble Tony's Durango 16" __________________.
88 Guest Bath: Off Guestroom

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet #1058 Eggshell (4/1). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile Tony's Travatino Charro 12x12 Grout:______. Starmark Windsor, Cherry/Earthen [4] Gold Uba Tuba (4/11) 1-1/4" w/ogee type edge Kohler Caxton (K-2210) undermount sink in Biscuit Grohe 20.700.820 faucet in PC. Kohler Wellworth (K-3422-F) elongated toilet in Biscuit Grohe 28.179.000 handshower in PC. in ceramic tile shower as per plan with copper pan. Shower door to be upgraded (CO #40). Shower floor: Travatino Charro 2x2. Skirting: Travatino Charro 6x12 _____________________ Travatino Charro 6x6 (lower wall), Travatino Charro brick 3x6 (upper wall). Top of shower: Venezia Antica Tourmaline 3x8 moulding. Liner: Positano Antico Tourmaline 1-1/2x6 (top), Umbria Antico Tournaline 3x8 (bottom).
88 Guest Bedroom: Beside Library

See it

9' high, Vaulted with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet #1058 Eggshell (4/1). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Hallway: Kit-Library

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Cherry door casing, Balance Clear pine. . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble __________________ __________ Grout: [5]____________.
88 Kitchen/Eating:

See it

9' high, Tray with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble ___________ _____________ ____________. Scandia - _________________________ [1] 1-1/4" Granite w/large ogee edge. Giallo Veneziano (2/4). 2 switches in counter powering outlets in sink base cabinets. ELU 36311OL undermount double sink in stainless steel. Island sink: ELU1113 sink. Grohe 33.939.000 Europlus II faucet in Brushed Nickel. Island Sink Faucet: 33.939.000 AVO faucet in BN. Instant hot. Franke PF-100 pot filler. Franke Little Butler H/C Filtered H2O Ceramic Tile Backsplash: _____________________
88 Laundry Room: Upstairs in location TBD

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile ___________ _____________ ____________. Starmark Windsor Cherry/Earthen. [4]. Washer and Dryer are built in cabinet area under counter (similar to a dishwasher installation) Miele W1926 washer, and Miele T1526A dryer (See built in plan for layout) Wilsonart Pampas 4166-60 (2/6) Kohler Ballad (K-3260) Grohe 33.330.000 in PC.
88 Library:

See it

9' high, Flat with Skip Troweled texture. Cherry . Walls are Raised Paneling Stained ____________[5]. Trim is Cherry Trim Stained _______________[4]. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat. Cherry Built-Ins. Bookshelves on lower unit with file drawers (CO #7) No Counter
88 Living Room:

See it

9' high, Flat/Slope with Skip Troweled texture. 3-1/2" Cherry Arch to Foyer . Walls are Martin Senour 60-2 (2/28). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat. Built ins in Cherry As per plan.
88 Loft: Over Dining Room

See it

9+' high, Partly Vaulted with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat. Stain-grade pine built-in approx 4'-3" wide. Bookshelves over cabinets (as in library) (CO #9)
88 Mast BR Closet:

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet 919 (3/22). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat. Three 3' x 7' mirrors in closet.
88 Master Bath:

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet 919 (3/22). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble Tony's Durango 12x12 (1/24) Grout: [5]____________. Starmark "Windham" Cherry Earthen. Marron Emporador Light (1/24) Kohler Bell 2(K-2804-P) in Biscuit Kohler Finial 2(K-310-4M) in polished nickel. Kohler Revival (K-3455-BR) lite elongated toilet in Biscuit Kohler (K-702-H)? Was K-712 3/12 C.O._____ cast iron whirlpool in Biscuit with Kohler Finial (K-T314-4F) roman tub filler in polished nickel with handheld (K-6526-SN) in polished nickel. Grohe 28.179.ARO handshower in satin nickel. Shower door to be custom (CO #40). Shower-Marble walk-in with built-in seat. Marron Emperor Light tub surround (1/24). Rectangular plate glass mirror?
88 Master Bedroom:

See it

8' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet 919 (3/22). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Western Pennsylvanian Cherry New England Hardwood Supply milled to 4 inches with 3 coats poly, satin finish coat.
88 Mudroom: Back Hall-Kit.

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile Tony's Durango (4/1) ____________.
88 Pantry Closet: Off Mudroom

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile ___________ _____________ ____________.
88 Playroom:

See it

9' high, Vaulted with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Carpet Berven of California "Essex" Deep Olive #39 (2/26).
88 Powder Room:

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Cherry casing around door, all other to be clear pine . Walls are Ben Moore Aqua Velvet Eggshell 1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Marble _________ _______________ Grout: [5]____________. Bureau-type vanity. drain and supplies from wall only Marron Emporador Light marble (1/24) including backsplash. Kohler K-14225 Vessels Iron Etchings(TM) Design on Vessels Iron Bell lav in Serengeti. Sink set in vanity (2/6) Kohler Finial (K-310-4M) in polished nickel. Kohler Revival (K-3455-BR) elongated toilet in Biscuit [3]____________
88 Study:

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Carpet Berven of California "Essex" Deep Olive #39 (2/26).
88 Utility Room: Off Mudroom

See it

9' high, Flat with Skip Troweled texture. 3-1/2" Jalco . Walls are Ben Moore Aqua Velvet Eggshell #1058 (1/30). Trim is Stain with 3 coats ___________ [5] Poly Cabot Early American 2016 with (per Gallon) MY16, PB8 on Cherry plus RO6 on Pine. Ceramic Tile ___________ _____________ ____________. Starmark Windsor, Cherry Earthen Giallo Veneziano (2/4) Granite counter C.O.#3 ELU2118 sink. 33.939.000 faucet in PC. _____________________

ADDENDUMS TO ORIGINAL CONTRACT
#: DATE: REFERENCE: -------------------------DESCRIPTION------------------------- STATUS: CHANGE DONE/ AWAITING:
Jan 27, 2003 Dornbracht Lever HandlesFor Expired -
1 Mar 12, 2001 WhirlpoolFor changing from specced whirlpool (K-712-H) in Almond to chosen whirlpool (K-702-N) in Biscuit. Note: All fixtures to be changed from Almond to Biscuit.AcceptedY -
2 Apr 1, 2001 Add 2' width through house front to back through Living RoomFor adding 2 feet width through Living Room and Library (including the rooms above)AcceptedY -
3 Mar 12, 2001 Specs Meeting ChangesFor Plan changes resulting from "Specs" MeetingAcceptedY -
4 Apr 1, 2001 Final Window ScheduleFor To change from windows and doors specified in sizes as shown on plan to those on quotes.AcceptedY -
5 Apr 15, 2001 Eliminate Barrel Vault at Game Room/PorchFor Eliminating the Barrel Vault. Credit for actual window is accounted for in the window change order.AcceptedY -
6 Jul 12, 2001 Curved RoofsFor Changing the roofline to incorporate a curve as shown on "Curved Rafter Tail" plan date 7/9/2001. Current change includes changing all roofs including front, rear and sides of house and all bays and dormers.AcceptedY -
7 May 4, 2001 Library Built-InsFor adding 8' cherry built-ins to Library. Bookshelves on lower unit with file drawers.AcceptedY -
8 May 4, 2001 Move Library DoorFor moving door from Library to Guest Bedroom 1' toward back of house to accommodate built-in cabinets.AcceptedY -
9 May 4, 2001 Loft Built-InFor building stain grade pine built-in approximately 4'-3" wide in loft recess. Counter with doors below (raised panel) with adjustable shelves above.AcceptedY -
10 May 4, 2001 Eliminate Brick Wing-Wall at Garage CornerFor AcceptedY -
11 Jul 2, 2001 Rough plumbing for future basement bathFor providing pump tank and drain lines for future bath plumbing. price includes labor and materials related to the tank and drain lines but not the pump itself.AcceptedY -
12 Aug 28, 2001 Change Study window to 3547 from 3541For changing the rear study window to 3547 from 3541.AcceptedY -
13 Aug 28, 2001 Slope 4th Side of Gameroom Ceiling. 12' Flat CeilingFor AcceptedY -
14 Mar 12, 2001 Expand Bedroom 2 & 3 ClosetsFor cost of finishing approx 70 S.F. additional area in Bedroom 2 and 3 closets not covered by structural costs included in CO #3. This change does not contemplate any additional closet shelving needed for the large closet compared to the original closets so additional closet shelving and accessories shall be compared with shelving in specified for original closets.AcceptedY -
15 Jul 31, 2001 Increase width of Playroom and StudyFor costs related to increasing the width of area orver garage including engineering review, minor structural costs and cost of additional finished areaAcceptedY -
16 Nov 21, 2001 Great Room/Kitchen Cased OpeningFor changing Great Room/Kitchen cased opening to an arch.AcceptedY -
17 Nov 14, 2001 Build Terrace Walls, Curved StairsFor adding masonry wall 16" to 18" around terrace and lower grade around to approx 30" below terrace height. There will be a large set of curved stairs with four risers terrace to grade off back.AcceptedY -
18 Dec 17, 2001 HVAC Changes, Water Heater ChangeFor upgrading the HVAC system from that specified to system proposed with upgrades including; Upgrading forced hot air furnace to Viessmann Vitogas 100 Model GSD-60 boiler connected to Lennox variable speed air handlers and two high efficiency air conditioners. Radiant heat to be supplied by boiler in areas originally specified in electric plus balance of mudroom area. This change includes changing stand alone gas water heater specified to a Viessmann Vitocell - V300 92 gallon waterstorage tank connected to vitogas boiler.AcceptedY -
19 Jan 2, 2002 Change walls to skip troweled.For changing all walls from smooth plaster to light skip troweledAcceptedY -
20 Mar 14, 2002 Closet ShelvingFor shelving as provided by Closet Solutions in quote dated 3/5/02, vs. Allowance for Master Closet shelving and credit for ventilated shelving scheduled for the other closets in house.AcceptedY -
21 Mar 21, 2002 Baldwin KnobsFor installing Baldwin "Classic" knobs and "Wave" lever door latches in place of those specified.AcceptedY -
22 Feb 28, 2002 Add French Door Pair at Playroom StairFor lowering the ceiling and installing a wall and French Doors at the head of the stairs to Playroom.AcceptedY -
23 Feb 28, 2002 Rear Retaining WallFor building large boulder retaining wall in rear yard and raising grade as per approved "Sewage Disposal System" plan dated 1-17-02.AcceptedY -
24 Feb 28, 2002 Front Retaining WallFor building retaining wall in front of house and changing grades as per approved " Sewage Disposal System" plan dated 1-17-02. Walls to be made of brown and gray Corinthian veneer stone laid on the flat with a dry looking joint. top to be dry / dry looking. wall to be on crushed stone base with crushed stone behind it to facilitate drainage. Geotextile fabric will be used behind upper crushed stone area to protect it from backfill. Top of wall may need yearly maintenance resulting from freeze/thaw and dislodging, of dry looking top layer of stone, as well as dislodging due to people walking on the top of the wall.AcceptedY -
25 Jul 2, 2001 Fireplace VeneersFor installing fieldstone veneer in mosaic pattern in place of the brick veneer specified. Use 2" limestone hearth, 18" deep. Both Game Room and Livingroom firebox to have arches with perimeter stones protruding 3/4" to 1" from main veneer faceAcceptedY -
26 Aug 28, 2001 Insulate Powder Room walls and Back Bath wallsFor insulating Powder Room walls and Back Bath walls.AcceptedY -
27 Aug 29, 2001 Clay Chimney PotsFor supplying and installing three special order clay chimney pots.AcceptedY -
28 Nov 28, 2001 Security System ExtrasFor installing security system extras.AcceptedY -
29 Dec 4, 2001 Library Coffered Ceiling in CherryFor installing Library coffered ceiling in cherry.AcceptedY -
30 Jan 9, 2002 Brick VeneerFor credit for actual cost of chosen "Cortez" brick vs. allowance.AcceptedY -
31 Jan 9, 2002 Credit for Arched Valance over Master VanitiesFor eliminating arched valance over Master Bath vanitiesAcceptedY -
32 Jan 14, 2002 Cherry FlooringFor installing 3600 S.F. stained 4" all heart cherry flooring in place of the cherry flooring specified.AcceptedY -
33 Apr 1, 2002 Painting all walls third coatFor adding a 3rd coat of wall paint.AcceptedY -
34 Apr 22, 2002 Installation of Dacora PlugsFor installing Dacora plugs in switches in place of those specified.AcceptedY -
35 Feb 21, 2001 AppliancesFor changing from specced appliances to chosen appliances.AcceptedY -
37 Aug 28, 2001 Bookcase vs. Closet in Playroom KneewallFor installing a bookcase vs. closet in Playroom kneewall.AcceptedY -
38 Dec 7, 2001 Additional Cherry TrimFor installation of additional cherry trim including:

Library Windows, Back stair parts, "Andover" cherry casings at Foyer openings to Dining and Living Rooms. Front stair risers, and skirts.

AcceptedY -
39 Dec 18, 2001 Revisions to Conservation PlansFor costs incurred revising site plans to accommodate a circular driveway, and retaining wall in the rear yard. Includes meetings with Dana Perkins Engineers, costs to prepare a new plan, any filing and attending one conservation meeting. There are no costs included other than the costs to get permission to do the work shown on the plan.AcceptedY -
40 Jan 9, 2002 Master and Guest Bath Shower DoorsFor installation of a shower door in Master Bath, and upgrade of door specified in Guest Bath.AcceptedY -
41 Jan 17, 2002 Main Stair RailingsFor purchase and installation of all chosen main stair railing partsAcceptedY -
42 Apr 22, 2002 Decorative Iron HandrailsFor the installation of wrought iron rails at Mudroom, Utility Room and Eating Area steps.AcceptedY -
43 May 1, 2002 Credit for Front Door LocksetFor Credit for Front Door LocksetAcceptedY -
44 May 2, 2002 Additional Gutters with Copper DownspoutsFor installing additional gutters with copper downspouts. Undergound drainage system is being included at no chargeAcceptedY -
45 May 2, 2002 Credit for Plate MirrorsFor credit of specified/ typical mirrorsAcceptedY -
46 May 8, 2002 Marble and Granite SlabsFor installing requested marble and granite slabs in place of those specified.AcceptedY -
47 May 22, 2002 Credit for Window Box at Garage WindowFor Credit for Window Box, Paint, MountingAcceptedY -
48 Feb 20, 2002 Antique Nickel HingesFor installing antique nickel hinges in place of the brushed brass original hinges.AcceptedY -
49 Aug 22, 2002 New BacksplashFor replacing granite backsplash in Laundry and Powder Room with thinner granite backsplash with bullnosed edges.AcceptedY -
50 Aug 8, 2002 Installation of Well for IrrigationFor drilling well,installing pump, electrical costs and excavation.AcceptedY -
51 Feb 28, 2002 Expanded/ circular drivewayFor building driveway and changing grades as per approved " Sewage Disposal System" plan dated 1-17-02. Includes the cost of additional driveway paving, reinforcing of outside curve, gravel and base preparation, and conduits to island.AcceptedY -
52 May 22, 2002 Hinges on KML DoorsFor providing antique nickel hinges for the KML exterior doors.AcceptedY -
53 May 23, 2002 Wiring ExtrasFor extra wiring for various outlets as per worksheetAcceptedY -
57 Apr 17, 2002 Wing Wall Changes at StreetFor building wing walls/piers in different shape, using granite cap.AcceptedY -
59 Oct 23, 2002 Additional IrrigationFor installing three more shrub zones (8 zones total), 2 drip zones for trees, 1 high pressure fresh water line running from the house to an outside faucet and 1 filtered low pressure cold water copper line to bubbler.AcceptedY -
60 Oct 8, 2002 Bench with Water FountainFor building bench with water fountain. Price included installation of basin and chiller in the spring in a format that allows for efficient removal and reinstallation on an annual basis.AcceptedY -
61 Aug 1, 2002 Fine Grading for Tennis CourtFor cost of gravel and machine work to fine grade under the tennis court.AcceptedY -
62 Mar 12, 2001 Plumbing ChangesFor Changes made in final vs. specified plumbing items - see attached worksheetAcceptedY -